A Monthly Magazine
Engineering, Procurement, Construction & Infrastructure
NEWS
AmpereHour Energy launches Intelligent Energy Storage Manufacturing Platform

AmpereHour Energy, a leading full-stack Battery Energy Storage System (BESS) solutions provider, has announced the inauguration of its new BESS Manufacturing and Integration Facility in Chakan, Pune. The facility will focus on the integration of Make in India cabinet and containerized Battery DC-AC Blocks for utility-scale and commercial and industrial applications.

The platform combines AmpereHour’s expertise in hardware-agnostic architecture, proprietary Energy Management Systems (EMS), subsystem engineering, and advanced safety design with AH-Suite: AmpereHour’s digital factory quality management and product testing platform (AH Factory Suite), enabling complete traceability, performance validation, and a faster transition from factory to field.

With a planned capacity of 5.0 GWh, the facility represents a strategic investment towards strengthening India’s energy storage ecosystem through localized integration, deeper engineering capabilities, and digital innovation.

*****
Back to News