AmpereHour Energy, a leading full-stack Battery
Energy Storage System (BESS) solutions provider, has announced the inauguration
of its new BESS Manufacturing and Integration Facility in Chakan, Pune. The
facility will focus on the integration of Make in India cabinet and
containerized Battery DC-AC Blocks for utility-scale and commercial and
industrial applications.
The platform combines AmpereHour’s expertise in
hardware-agnostic architecture, proprietary Energy Management Systems (EMS),
subsystem engineering, and advanced safety design with AH-Suite: AmpereHour’s
digital factory quality management and product testing platform (AH Factory
Suite), enabling complete traceability, performance validation, and a faster
transition from factory to field.
With a planned capacity of 5.0 GWh, the facility
represents a strategic investment towards strengthening India’s energy storage
ecosystem through localized integration, deeper engineering capabilities, and
digital innovation.